The CDM project design document for afforestation and reforestation projects is a form with a fixed order. Everyone who files one answers the same sections in the same sequence, and the validator checks them in that sequence. This post is a map of the form, using one filed document as the example.
The form
The version in our source is the CDM-AR-PDD form, version 04. It has eight sections, A to H, and nine annexes.
| Section | Title |
|---|---|
| A | General description of the proposed A/R CDM project activity |
| B | Duration of the project activity and crediting period |
| C | Application of an approved baseline and monitoring methodology |
| D | Estimation of ex ante net anthropogenic GHG removals by sinks |
| E | Monitoring plan |
| F | Environmental impacts |
| G | Socio-economic impacts |
| H | Stakeholders' comments |
The validation report that goes with the PDD follows the same lettering in its checklist, so a gap in one shows up as a question in the other. For how that report is built, see our post on the anatomy of a validation report.
Section A: ten parts
Section A is the longest descriptive section. Its ten parts are:
- A.1 title of the activity - A.2 description of the activity - A.3 project participants - A.4 location and boundaries - A.5 technical description - A.6 legal title to the land, land tenure and rights to the credits - A.7 assessment of the eligibility of the land - A.8 approach for addressing non-permanence - A.9 estimated net removals over the crediting period - A.10 public funding
A few notes from the example and its checklist:
- A.1 is tested for uniqueness and for consistent version numbers and dates. The example went from version 01 to version 06 during validation. - A.4 asks for geographic delineation of every parcel. In the example the project was a set of discrete parcels, and a commenter asked for coordinates of each. - A.5 covers present environmental conditions, any rare or endangered species, the species and varieties to be grown, know-how and measures to minimise negative impacts. - A.8 is a single choice between temporary and long-term credits. The example chose temporary credits (tCERs). - A.9 is a summary table. In the example, baseline removals were set to zero and the validator asked for the table to be corrected after a change in project area. - A.10 requires a statement on public funding from developed countries. The validator asked for a document confirming that no official development assistance was involved.
Section B: duration
Section B has three parts: the start date of the activity and of the crediting period, the expected operational lifetime, and the choice of crediting period. The start date matters because later parts of the form ask about prior consideration of the CDM.
Section C: baseline and methodology
Section C applies an approved methodology. Its eight parts:
- C.1 title and reference of the approved methodology - C.2 applicability of the methodology to the project - C.3 selected carbon pools and emission sources - C.4 strata identified by ex ante stratification - C.5 identification of the baseline scenario - C.6 assessment and demonstration of additionality - C.7 estimate of ex ante baseline net removals - C.8 date of completion of the baseline study and the people who did it
In the example, C.6 was by far the longest part, around 590 lines of text against roughly 90 for C.7. That is typical: additionality takes the most argument. The validation report breaks it into prior consideration of the CDM, alternatives, a barrier analysis and a common practice analysis.
Sections D and E: numbers and monitoring
D has two parts: the ex ante actual net removals (D.1) and the ex ante leakage (D.2). The example's validator recorded actual net removals of 146,888 tCO2e, leakage of 0 tCO2e, and net removals of 146,888 tCO2e. In that project, a commenter had asked about livestock displacement, and leakage was addressed in D.2.
E has eight parts, and it is where the PDD becomes a field manual:
- E.1 monitoring of project implementation - E.2 sampling design and stratification - E.3 monitoring of the baseline net removals, if required - E.4 monitoring of the actual net removals - E.5 leakage - E.6 additional quality control and quality assurance - E.7 operational and management structure - E.8 the person applying the monitoring plan
The example's E.4 was one of the longest parts of the whole document, over a thousand lines. The validator checked that the sampling approach, the QA/QC procedures for field data and the procedures for data entry were defined.
Sections F, G, H and the annexes
- F and G each have three parts: the documentation of the impact analysis, a statement on any significant negative impact, and monitoring and remedial measures. The F and G text in the example was long, with the socio-economic part close to 200 lines. - H has three parts: how comments were invited and compiled, a summary of the comments, and how due account was taken.
The nine annexes are contact information, public funding information, baseline information, the monitoring plan, the list of land parcels, the calculation of sample size, the ex ante removals calculation, a participatory rural appraisal, and the list of participating villages.
Why the order matters
- Fill the form in the order a validator will read it. Discrepancies between A.9, D.1 and Annex 7 are common. - Put detail in the annexes, not in the body. The example used annexes for parcels, sample size and projections. - Keep a version log. A project can go through six versions before it is final. - Treat E as a promise. It is the plan you will later be verified against.
TREEO can help check a draft form for cross-section consistency before it goes to an auditor.
Move beyond estimates
Verifiers test sampling design, uncertainty and whether a number traces back to the field. TREEO dMRV captures that evidence in real time, in one auditable chain.



