Documentary photograph illustrating free, Prior and Informed Consent
← Back to blog

Free, Prior and Informed Consent: The Four Words That Each Carry Weight

Community•12 October 2026•TREEO Indonesia•1 min read

FPIC is treated as an acronym to be satisfied. Each of its four words is a separate obligation, and projects usually fail on one specific word rather than on the concept.

What each word requires

  • Free

    Consent given without coercion, intimidation, or manipulation, including the subtler forms, such as benefits conditional on agreement, or negotiating only with leaders who favour the project..

  • Prior

    Sought before activities begin and before decisions are effectively locked in. Consent obtained after a design is fixed is ratification, not consent.

  • Informed

    Communities understand what is proposed, in their own language, including duration, restrictions on land use, and what happens if the project fails.

  • Consent

    An affirmative decision by the community through its own legitimate decision making process, which is a process that the project does not get to define.

Where Projects Fail

Prior is the most common failure, and it is structural rather than malicious: engagement begins after feasibility work, boundary setting and methodology selection are complete, at which point genuine influence is limited.

Informed fails through omission. Carbon projects impose long-term land-use restrictions, and a community told about benefits but not about constraints has not been informed.

Free fails through leverage. Where a project controls access to services or employment, consent given in that context is difficult to characterise as free.

Consent Can Be Withheld

The part most often glossed over: FPIC includes the right to say no, and to withdraw consent later.

A process that can only produce agreement is not FPIC. Projects should be designed so that a community declining is a survivable outcome, which in practice means not committing capital to a specific site before consent is established.

The Documentation That Matters

Not a signed form. What validators look for is a record of the process: how the community's own decision-making structure was identified and respected, what information was provided and in what form, what was asked and answered, and what the project changed in response.

A signature at the end of an undocumented process proves very little, and is exactly what an assessor probes.

Track what happens after planting

Survival rate is the assumption that quietly decides a restoration forecast. TREEO Dashboard monitors planting cycles and tracks survival so the number you report is the number you measured.

Related Articles

FPIC in Carbon Projects: What Each Word Requires | TREEO Indonesia