Drawing the Boundary: Project Area, Leakage Belt and Reference Region

Methodology & dMRV•16 October 2026•TREEO Indonesia•2 min read

Carbon projects have three spatial boundaries doing three different jobs. Confusing them, or defining one casually, produces findings that are expensive to fix because the geometry underlies every subsequent calculation.

The Three Boundaries

BoundaryPurposeDefined by
Project areaWhere activities happen and credits are generatedTenure, activity extent, eligibility
Leakage beltWhere displaced activity would goProximity, access, and actor behaviour
Reference regionWhere baseline rates are derived fromSimilarity to the project area

The project area is usually drawn carefully because it determines the asset. The other two are frequently drawn quickly, and both are where validators probe.

The Leakage Belt Is Behavioural, Not Geometric

A leakage belt is often drawn as a fixed-width buffer around the project. That is convenient and usually wrong, because displaced activity does not move in concentric rings, but rather moves where access, tenure, and opportunity allow.

A defensible belt follows the roads, rivers and land-availability patterns that determine where an actor displaced from the project area would actually go. Sometimes that is adjacent; sometimes it is twenty kilometres away along a logging road, with the intervening land irrelevant.

Getting this right requires knowing who the actors are and how they operate, which is field knowledge rather than GIS work.

The Reference Region Trap

The reference region supplies the baseline rate, so its selection directly determines credit volume, which is exactly why standards have moved toward jurisdictional allocation and away from project selection.

Where a project still selects one, the requirement is demonstrable similarity: comparable forest type, pressure, accessibility and tenure. A region chosen because it has high historical deforestation, without that similarity argument, is the pattern that drew criticism to REDD+ baselines in the first place.

Practical Advice

Draw all three at the same time, not sequentially. They interact: a project area drawn to exclude a difficult parcel may push that parcel into the leakage belt, where it will be monitored anyway and its loss deducted.

And record the reasoning, not just the polygon. A boundary with a documented rationale survives a challenge; a shapefile with no explanation does not.

Check the land before you commit

Eligibility turns on land history and forest cover at a cut-off date. TREEO Eligibility runs satellite-based forest cover detection on your area of interest, before a single seed goes into the ground.