Peatlands hold a lot of carbon in a small area, and they release it quickly when drained or burned. BioCarbon, a voluntary carbon programme, has a methodology for this: BCR0007, Conservation and Restoration of Natural Continental Wetlands. The methodology text itself was not in our set, but one registered peatland PDD quotes and applies it in detail. This post reads that PDD to show what BCR0007 asks of a project.
What the project says it is
The PDD places the project in the AFOLU sector, in the category of conservation of continental wetlands (peatlands). It uses BCR0007 version 1.1, dated 7 February 2025, with BCR Standard 4.0. Key facts:
- It is not a grouped project. - The project area is 11,300 hectares of intact natural peatland, mapped through multitemporal satellite analysis with field verification, using IPCC land use categories and a national wetlands inventory. - The project start date is 1 January 2024. The quantification period runs from 1 January 2024 to 31 December 2053, which is 30 years. - The gases are the three Kyoto gases: CO2, CH4 and N2O.
The PDD presents BCR0007 as the single appropriate method for the ecosystem and says the project follows its procedures on baseline, additionality, uncertainty, leakage, risk and non-permanence.
Applicability conditions
The PDD includes a compliance table. Each row gives a condition, a yes or no, and justification with evidence. We saw two of the conditions:
| Condition | How the PDD answers |
|---|---|
| C1: the project area corresponds to continental natural wetlands | Mapped and validated as peatlands, both ombrotrophic and minerotrophic, a category within the methodology's wetland definition and recognised by the national inventory |
| C2: the project activities prevent land use change or degradation | Core activities are designed to prevent drainage, Sphagnum and peat extraction, and fires, named as the main degradation vectors |
Treat this table as the model for your own PDD. Do not just say the methodology applies. Say which condition, whether it is met, and what document proves it.
Activities that stop emissions
The project activities in the PDD are conservation actions. The ones named include:
- control of invasive exotic species, - fire prevention, with satellite monitoring and trained local brigades, - protection against land use change, - drainage restrictions, supported by water table sensors that detect unauthorised drainage, - patrols to prevent illegal extraction of Sphagnum and peat.
The PDD argues additionality from the absence of any regulation that explicitly requires active conservation of these peatlands or these management measures. It also says the activities prevent future emissions and keep the organic carbon stock in place. That is an avoided-loss claim, so the baseline matters most.
The baseline: a loss rate and four futures
BCR0007 quantifies reductions against a business-as-usual scenario. This PDD sets the baseline on current conditions, with an annual loss rate of 1.8 percent. It then presents four possible long-term scenarios, each with an assigned probability.
| Scenario | Annual loss rate | Probability |
|---|---|---|
| Current pressure continues | 1.8 percent | 40 percent |
| One or two energy megaprojects in the area of influence | 2.8 to 3.2 percent | 30 percent |
| Certified Sphagnum harvesting consolidates | 2.5 to 3.0 percent | 20 percent |
| Energy and extractive pressures coexist | 3.2 to 3.8 percent | 10 percent |
The probabilities add up to 100 percent. The key point is what the PDD does with this table: nothing in the credit calculation. It says the calculation rests only on the current 1.8 percent baseline, and the scenarios are there to show that the stated mitigation value is conservative. If pressure rises, avoided emissions would be higher than those accounted for. Whether a buyer finds that persuasive is a separate question, but the structure is worth copying: base the credits on the conservative case and keep the speculative upside outside the numbers.
Uncertainty
The PDD uses a bilateral 90 percent confidence interval. It includes an illustrative combined uncertainty from three parameters:
- carbon stock, with 15 percent, - annual carbon accumulation rate, with 20 percent, - peatland area, with 2 percent.
The combined figure is the square root of the sum of squares: the square root of (15 squared plus 20 squared plus 2 squared) comes to about 25 percent. The PDD labels this an illustrative example of the calculation. It is the standard way of combining independent relative errors, and area is the small term because it comes from georeferenced satellite mapping.
Reserves and risk
The PDD ends its quantification with a 20 percent credit buffer. Part of it is the project's own reserve, set by a risk score, and part is a contribution to the programme's general reserve. We cover that mechanism in a separate post on the BioCarbon 20 percent reserve.
Practical points
- Quote each applicability condition and give evidence. - Map the area with imagery and field checks, and say which inventory classification you used. - Name the degradation vectors, then match each activity to one. - Keep scenario analysis separate from the credit calculation. - Check which BCR0007 version your PDD and the standard both cite.
TREEO can help assemble the evidence table and baseline narrative for a wetlands PDD.
Move beyond estimates
Verifiers test sampling design, uncertainty and whether a number traces back to the field. TREEO dMRV captures that evidence in real time, in one auditable chain.